Projects

Kinney Engineering has worked on projects throughout Alaska.  Our clients include the State of Alaska and many cities, towns, and boroughs, as well as a variety of private clients.  No matter what the project, we are dedicated to finding the right solution to the right problem.

To find out more about our current projects, click on the links below:

Airport Way and Cushman Street Intersection Reconstruction
PROJECT WEBSITE >>

Alaska Richardson Steese Highways Corridor Action Plan
PROJECT WEBSITE >>

AMATS: Downtown Trail Connection
PROJECT WEBSITE >>

AMATS: Ocean Dock Road Reconnaissance Engineering Study
PROJECT WEBSITE >>

Anchorage Downtown Signals and Lighting Upgrades
PROJECT WEBSITE >>

City of Homer Transportation Plan
PROJECT WEBSITE >>

Glenn Highway: Airport Heights to Parks Hwy Rehabilitation
PROJECT WEBSITE >> 

HSIP: Bogard Rd at Engstrom Rd/Green Forest Dr
PROJECT WEBSITE >>

HSIP: Chena Small Tracts Roundabout 
PROJECT WEBSITE >>

Lake Otis Parkway Surface Rehabilitation
PROJECT WEBSITE >>

Old Richardson Highway Intersection Improvements
PROJECT WEBSITE >>

Anchorage Transit Center Study
PROJECT WEBSITE >>

Kinney Engineering

Our portfolio of projects includes:

AMATS: Ocean Dock Road Reconnaissance Engineering Study
Beaver Loop Road Improvements and Pedestrian Pathway (Kenai)
Bentley Trust Access (Fairbanks)
City of Valdez, Whalen Avenue Improvements
Cushman-Barnette Complete Streets (Fairbanks)
Dimond Transit Center Intermodal Facility Feasibility Study & Phase I Design (Anchorage)
Egan Drive & Yandukin Intersection Improvements (Juneau)
Fairbanks North Star Borough Civil Term Contract
Fairbanks Road/Rail Crossing Reduction/Realignment Plan
Gillam Way Rehabilitation (Fairbanks)
Glenn Highway / Eagle Glen Area Drainage Project (Eagle River)
Homer Intersections Study
Homer Spit Trails
HSIP C Street: Tudor Road and Dimond Boulevard Intersections (Anchorage)
HSIP Glenn Highway Speed Limit Evaluation: Palmer to Glennallen
HSIP Sterling Highway Slow Vehicle Turnouts
HSIP: Minnesota Drive Moose-Vehicle Crash Mitigation (Anchorage)
HSIP: Richardson Highway Speed Disparity Improvements: Valdez to Delta Junction
Matanuska Susitna Borough Functional Classification System Update
Mat-Su Area Roads Pavement Preservation (Group C)
Municipality of Anchorage Downtown Lighting and Signals Upgrade
Northern Region Motor Vehicle Plug-Ins
Parks Highway MP 163-183 Rehabilitation
Parks Highway: Lucus Road to Big Lake Cutoff
Penland Parkway Drainage and Surface Rehabilitation (Anchorage)
Steese Expressway / Johansen Expressway Interchange Environmental Phase
Sterling Highway Traffic Safety Corridor Study: Sterling to Soldotna
Toksook Bay Airport and Access Road Rehabilitation: Electrical Design
Valdez Pavement Management, Phases I & II
Vision Fairbanks Concept Traffic Analysis
Wasilla Main Street Traffic Study
West Dowling Road, Phase II (Anchorage)